ITTN-020: Summit Service Levels

  • Cristian Silva

Latest Revision: 2020-06-22

Note

This technote is not yet published.

IT service levels offered at the summit.

1   Introduction

Service levels offered at the summit.

2   Service Levels

2.1   Level 0

Verification of fibers state prior to the startup process.

Summit:1 FTE
Base:0 FTE
Time:3 hours
Activity Location IPAM Link
Visual inspection N/A N/A
Fiber checks N/A N/A

2.2   Level 1

Minimal connection at the summit with link to the base. Wired and Wireless are available.

Requires verification of the AURA DWDM at Casete Pachion with NOIRLab

Summit:2 FTE
Base:1 FTE
Time:6 hours
Device Location IPAM Link
Core Switches Rack ? link
Distribution Switches Rack ? link
Wireless Lan Controller Rack ? link
Access Switches Rack ? link
DWDM Rack ? link
Core Cluster Rack ? link
DNS Rack ? link
DHCP Rack ? link

2.3   Level 2

Level 1 + Telephony and Video Conference.

Requires reset of all IP phones.

Summit:1 FTE
Base:0 FTE
Time:3 hours

2.4   Level 3

Level 2 + Monitoring

Summit:1 FTE
Base:0 FTE
Time:6 hours
Device Location IPAM Link
APIC 1 Rack ? link
Leaf 01 and 03 Rack ? link
APIC 2 and 3 Rack ? link
Border Leafs Rack ? link
Remaining Leafs Rack ? link
HVAC Server Rack ? link

2.5   Level 4

Level 3 + Main Computing

Summit:1 FTE
Base:1 FTE
Time:4 hours
Device Location IPAM Link
Amor cluster Rack link
Andes cluster Rack link
Azar cluster Rack link

2.6   Level 5

Level 4 + Building

Requires reset of ip phones.

Summit:2 FTE
Base:1 FTE
Time:6+ hours
Device Location IPAM Link
1st Floor (incl. GeoVictoria)
3rd Floor (incl. M2, Hex-Rot,etc)
5th Floor
Upper Levels Wifi

2.7   Level 6

Level 5 + Auxtel and calibration hill

Requires reset of ip phones in Auxtel.

Summit:2 FTE
Base:1 FTE
Time:4 hours
Device Location IPAM Link
Auxtel Rack
Weather, Dimm and All-Sky Cab.
Main Generator Cabinet

2.8   Level 7

Level 6 + all the rest

Summit:2 FTE
Base:0 FTE
Time:4 hours
Device Location IPAM Link
Summit Villa
Contractors Network
Casino
Any other